Hey everyone,
just wanted some th
oughts on the rejig of my building, i have respaced all of the sections at 1.5m intervals and used the water outline as the curve to place them on, i have additionally rotated each section curve to be perpendicular with the water curve.
oughts on the rejig of my building, i have respaced all of the sections at 1.5m intervals and used the water outline as the curve to place them on, i have additionally rotated each section curve to be perpendicular with the water curve.I think this makes more sense at there is a rule to the spacing, and the wetlands themselve have an influence on the design.





